2015年3月17日星期二

Installation of Spiral Chute



 

The spiral chute is a combination mining equipment of rotating spiral concentrator, shaker and centrifugal concentrator. It can be applied to the mining at waterfront, River, sand beaches and river channel.

Xinguang Machinery is one of the leading manufacturers in producing high efficiency and energy-saving mining machinery in Henan Province, China. We mainly provide ball mills, stone crushers, magnetic separators, floatation machines, pelletizers, vibrating feeders, vibrating screens, sand-washing machines, belt conveyors, driers and rotary kilns. Today Xinguang will explain the installation of spiral chute to our customers.

Check on the quality of FRP helix slice (especially the quality of the work surface), size and shape when meets the requirements before assembly. Screw on the connecting bolt holes by manufacturers commonly with drilling well in advance. Such as factory without processing, must be the same template, drilling to ensure good interchangeability. With bolts to connect piece of five spirals into a set of spiral groove, horizontal, the adjacent two pieces of flange connection place within the surface is smooth transition, join to pay special attention to the lower surface shall not be less than the lower surface of the corresponding, radial direction.(groove width direction) from the outer edge alignment, not allowed at the lower edge, the purpose of this installation is to prevent the accident flow splash. Have a seam connection place, need to use putty screening. Good will to join five pieces of a set of four (or 2, 3) spiral screw together, distribution into the required shape. Four pillar of (3 pillar) respectively in four or three, two spiral groove, the spiral groove with bolt and pillar fixed, and then install the cross (a tripod), make each head screw uniformly distributed along the garden weeks, finally on the spin good all bolts. After installation, Screw it to keep the natural shape, can not have obvious variants. The feeder trough and product intercepting trough respectively in the first end of the spiral groove and end to ensure the connection place tightly hold water. If there is a gap, need coating seal to ensure that the groove surface smooth transition. The feeder separator and uniform product concentration do not join with slot bracket, free place on the scaffold, when installation should pay attention to put positive position according to drawing. Each row tube of distributor should be respectively on the corresponding to the trough. Spiral chute base generally don't need to be fixed, but on the same level of four (three) based on plane, after installation, should check the vertical axis of spiral groove is vertical, can adjust the vertical degree under the pillar and gasket. Spiral chute is set at the proper height operation platform, spiral groove pillar with the platform to be appropriate.

没有评论:

发表评论